Home 9 Current Studies 9 Afton Mountain Transportation Site Assessment

Afton Mountain Transportation Site Assessment

The FY24 SAWMPO Afton Mountain Transportation Site Assessment is evaluating existing vehicular and bicycle and pedestrian conditions at the Inn at Afton Mountain near the I-64 Exit 99 interchange as part of a larger site assessment being conducted by Augusta County. Timmons Group is leading the MPO transportation study. The Scope of Work for the MPO study includes existing conditions data collection and a site visit, a future development scenario to inform recommendations, and three concept layouts depicting improvements. The Study will begin in September 2023, and conclude in Spring 2024.